This Child Care Centre in Doreen covers almost 1,000 m² of floor area with a cavernous 3m ceiling height. Thanks to our efficient engineering we were able to minimise the use of structural steel to essentially just portico posts only. In total, the project required around 10,000 lineal metres of Truecore steel to roll all the wall frames & roof trusses which incorporated all mechanical requirements.